LOCATION: Morningside, QLD
CLIENT: FIFE Capital
VALUE: $54 Million
ROLE:

The project consisted of 3 cold store tenancies, being 19,500sqm of GFA over the 40,700 sqm site, each with its own cold room, freezer and 2-storey Office constructed over an 18 month programme.  The development had a central refrigeration plantroom with integrated flow meters monitoring the refrigeration consumption for each tenancy.

Four Solar Arrays were provided to the building, 1 x 50kW system per tenancy and 1 x 200kW system for community power (incl refrigeration plant).  29 dock levelers were constructed along with a glycol based sub floor heating system.

The purpose built Refrigeration System (Ammonia based) provided:

Internal Cold Room Height   = 11.5m

Freezer Temps                        = -25C to -1C

Coldroom Temps                    = 0C to +8C

Anteroom Temps                   = +3C to +12C

Unit 1 Cold Store / Freezer 6,050 sqm and Office are of 350 sqm

Unit 2 Cold Room / Freeze 6,520 sqm and Office area of 350 sqm

Unit 3 Cold Room / Freezer 5,785 sqm and Office area of 340 sqm